2500 Tons/Day Dry Process Cement Plant

First, limestone is crushed by the MB56/75 crusher. When the maximum feeding size is not more than 1500mm and the discharging size is not more than 75mm, the crushing capacity of this machine is 500 to 600t/h

Video Show

Process Flow of 2500Tons/Day Dry Process Cement Plant:
The main process flow of this 2500t/d dry process cement plant is as follows:
1. Crushing, Conveying and Storing of Limestone.
First, limestone is crushed by the MB56/75 crusher. When the maximum feeding size is not more than 1500mm and the discharging size is not more than 75mm, the crushing capacity of this machine is 500 to 600t/h.
Second, the crushed limestone will be transported by belt conveyor to the Φ80m round prehomogenization yard whose storage capacity is 34100t.
Third, the crushed limestone will be prehomogenized and then stored in this yard. Additionally, the stacking capacity of our stacker is 800t/h, and the reclaiming capacity of reclaimer is 500t/h.
Finally, the prehomogenized limestone will be sent to the batching station for raw materials.
2. Storing, Crushing and Conveying of Auxiliary Raw Materials.
The open storage yard for sandstones has a specification of 60 m×20m, and a storage capacity of 5100t. And the open storage yard for iron ores has a specification of 32 m×20m, and a storage capacity of 2730 t.
PC1609 hammer crusher is used to crush both sandstones and iron ores. When the feeding size is not more than 600mm, and discharging size less than 25mm, its crushing capacity is 50 to 70t/h.
The crushed sandstones and iron ores will be sent by the belt conveyor to batching warehouse for storage.
The pulverized coal will be stored in the batching warehouse for storage through the self-discharging system.
3. Batching Station for Raw Materials.
In the batching station, there are four batching warehouses respectively for limestone, sandstones, iron ores, and pulverized coal, and their specifications are φ12 m×25m, and storage capacity are 2200t,1600t, 2200t, and 770t respectively. Inside these warehouses, there are weighing feeders used to measure materials to be given.
4. Grinding of Raw Materials and Waste Gases Treating.
MLS3626 vertical mill is used to grind raw materials, and waste gases from preheater are applied in drying. The whole production capacity is 185t/h.
Grinded raw meal is separated by the fine powder separator, and then mixed with powder in the conditioning tower and electric environmental protection equipment. Finally it will be sent to the homogenizing warehouse for homogenization as well as storage.
Waste gases from the mill will take purification treatment in the electric environmental protection equipment before discharged into the air.
5. Homogenizing of Raw Meal.
Our CP homogenizing silo has a specification of Φ18m×50m, and its effective storage capacity is 9000t.
6. Calcining and Storing of Clinker.
The specification of our RF5/2500 decomposition furnace isΦ4.0×60m, and our round 2-φ18×40m warehouse has an effective storage capacity of 2-10000t. Additionally, the final discharging gas has a dust content less than 100mg/m3 if in standard conditions.
7. Storing and Conveying of Raw Coal and Pulverized Coal.
Raw coal will be stored and prehomogenized in a crane room with a specification of 21m×113m and a storage capacity of 9300t. There are two raw coal silos in the crane room, and weighing feeder can also be found in that room. A MPF1713 coal grinder is used to grind coal. When the moisture of feeding materials is no more than 10%, the moisture of pulverized coal is no more than 1%, and the particle size of raw meal is no more than 50mm, the output of the whole system is 20t/h.
The pulverized coal will be sent to two silos for storage, and the purified waste gas is discharged into the atmosphere. There is also measuring system in these two silos.
8. Drying and Conveying of Slag and Crushing and Conveying of Gypsum.
The drying capacity of ourφ2.4×18.350m dryer is more than 30t/h, and the open storage area has a storage capacity of 4000t. When the feeding size is no more than 600mm and the discharging size is no more than 25mm, the productivity of our PFC-1609 impact hammer crusher is 50 to 70t/h.
9. Grinding, Conveying and Storing of Cement.
In the cement batching station, there are four batching rooms respectively for clinker, gypsum, limestone and slag. And the clinker one has a specification of φ10 m×22m and a storage capacity of 2000t. The specification of batching rooms of gypsum, slag and limestone is φ8 m×22m, and their storage capacity is 800t, 400t and 900t respectively. The packaging capacity of packing machine is 90t/h.
As a professional manufacturer and supplier of 2500t/d dry process cement plant in China, Jiangsu Pengfei Group Co., Ltd can also provide you with various other machines, such as 100,000tons/year small cement production equipment, new type dry process cement production line, cement grinding plant, industrial kiln and furnace, grinding equipment, crushing equipment, environmental protection equipment, cooling equipment, drying equipment, compound fertilizer equipment, packing machine, chemical equipment and electrical control system. Most of our products have passed the certification of ISO9000 and CE, and they have been quite popular among customers from as many as
ENQUIRY

Hot Products

Active Lime Production Line

Active Lime Production Line

This 600tpd active lime production line is a complete line that includes vertical preheater, rotary kiln, grate cooler, air treatment system, raw material conveyor system, finished product conveyor system, raw coal grinding system, and so on. DCS central control system is employed to make concentrated operation management.

READ MORE
2500TPD new type dry process cement clinker production line

2500TPD new type dry process cement clinker production line

The 2500t / d cement clinker production line adopts a new dry process, with an annual output of 775,000 tons of cement clinker and a total cement output of 1.05 million tons / year. A cement production line and auxiliary facilities from limestone crushing to cement packaging are constructed. Specialties include raw materials, production technology, electrical and automation, water supply and drainage, HVAC fire protection, building structure, environmental protection, etc. Cement products are calibrated according to Chinese standard ordinary portland cement.

READ MORE
Cement production line with annual output of 1.2 million tons

Cement production line with annual output of 1.2 million tons

Pengfei EPC cement production line project includes process design, equipment supply (including mechanical and electrical parts), civil engineering, installation and commissioning, trial operation, reaching the production standard and final delivery and other services. Mechanical equipment includes limestone crushing and conveying, clay crushing, raw coal crushing, raw coal and auxiliary raw material pre homogenization yard, raw material proportioning station, raw material grinding and waste gas treatment, raw material homogenization silo and raw material feeding into kiln, firing kiln tail, firing kiln middle and tertiary air pipe, firing kiln head, clinker conveying, clinker storage and conveying, pulverized coal preparation and metering conveying, cement proportioning station and clinker Bulk, gypsum, mixture crushing and conveying, cement grinding and conveying, cement storage and conveying, cement packaging, bagged cement loading, cement truck bulk, machine repair workshop and total material warehouse.

READ MORE
Cement Rotary Kiln

Cement Rotary Kiln

As the main equipment in both of the cement clinker dry and wet process production lines, this cement rotary kiln is widely used in metallurgy field, Cement Rotary Kilnchemical industry, building refractory material sector, environmental protection field, and so on. It mainly consists of cylinder body, supporting device, supporting device with catch wheel, driving device, movable kiln head, sealing equipment of the kiln end, coal spraying pipe, etc

READ MORE
Rotary Drum Granulator

Rotary Drum Granulator

Our TQT rotary drum granulator is an essential machine for compound fertilizer production. Its granulation ratio is as much as 70%, and its granulated products have strength more than 10N. Besides, its products have even nutrients, and strong adaptability. It can also be used in the production line of compound fertilizers used to supplement water for soils.

READ MORE
1500t / d cement production line

1500t / d cement production line

Pengfei EPC cement production line project includes process design, equipment supply (including mechanical and electrical parts), civil engineering, installation and commissioning, trial operation, reaching the production standard and final delivery and other services. Mechanical equipment includes limestone crushing and conveying, clay crushing, raw coal crushing, raw coal and auxiliary raw material pre homogenization yard, raw material proportioning station, raw material grinding and waste gas treatment, raw material homogenization silo and raw material feeding into kiln, firing kiln tail, firing kiln middle and tertiary air pipe, firing kiln head, clinker conveying, clinker storage and conveying, pulverized coal preparation and metering conveying, cement proportioning station and clinker Bulk, gypsum, mixture crushing and conveying, cement grinding and conveying, cement storage and conveying, cement packaging, bagged cement loading, cement truck bulk, machine repair workshop and total material warehouse.

READ MORE
5000 Tons/Day New Type Dry Process Cement Production Line

5000 Tons/Day New Type Dry Process Cement Production Line

Pengfei 5000t/d dry process cement production line is excellent in saving energy. It adopts various high efficient cement equipment and devices. It is designed with a smooth and tight process flow.e try to reduce production process and save transport cost. High-accuracy measuring equipment is adopted to reduce raw fuel waste and product loss. This cement production line is eco-friendly

READ MORE
Cement grinding station with annual output of 1 million tons

Cement grinding station with annual output of 1 million tons

Description The cement grinding station with an annual output of 1 million tons adopts the technology of separately grinding clinker and slag, among which the clinker grinding adopts the combined grinding process composed of two Φ 4.2m × 13m cement mills. The production process of the grinding station is stable, achieving the goal of high quality, high yield and low consumption.

READ MORE
+86-513-88755311
PRODUCTS   LIST