Addtime: 2017-02-16
In 2015 overall economic situation fell significantly, cement industry profits fell to the bottom, in order to use "The Belt and Road" and overseas layout to achieve bottoming out, each cement plant will save production costs and the introduction of green environmental protection equipment as the primary bargaining chip. In the process of cement production, cement clinker, materials, slag can be used after grinding, however, the results show that the best grinding efficiency can be achieved only by different materials separately.
1. General situation of "one grinding and multi use" vertical mill
Xinxiang Yu Hui Yellow River building materials Co., Ltd. is located in Xinxiang city of Huixian Mengzhuang Town Economic Development Zone, plant height is about 100m. In order to make full use of local blast furnace slag and cement clinker, Yu Hui Huang building materials in April 2014 to start the construction of an annual output of 600 thousand tons of iron ore /100 million tons of cement production, completed and put into production in December 2014. Since the production line has been put into operation, the roller mill has been running smoothly, the production of slag surface area is 450m2/kg, the maximum yield can reach 120t/h; the specific surface area of cement (32.5) is 380m2/kg, the maximum yield was 190 t/h; the specific surface area of concrete admixture is 300~380m2/kg. The maximum yield was 225t/h; This system can be completed in 40 minutes slag, cement clinker, gypsum and other mixed materials between the switch.
In this paper, the process characteristics of the system are briefly introduced for reference
2.Process introduction
2.1 Feeding system
Wet slag, cement clinker, gypsum and other mixed materials are transported to the storage yard by truck transport, and into the hopper by forklift, this product line is provided with 5 feed hopper, in order to meet the requirements of different products. The bottom of each hopper is provided with a quantitative feeding method, through the transfer station into the vertical mill, a vibration screen is arranged at the transfer station, the aim is to remove impurities from raw materials when producing slag, but when producing the cement, this vibrating screen requires short circuit. In order to prevent metal block from entering vertical mill, the conveyor belt is arranged on the separator and metal detector.
2.2 grinding system
The material from the feed into the central millstone mill, motor driven by reducer rotating disc, under the action of centrifugal force to the disc edge and the grinding roller compacted by mobile, the crushed material overflow from the disc edge, at the same time from the nozzle ring (air ring) high efficiency separator of high speed upward hot air flow to the mill and one in the coarse powder separator after separation after the return to the disc, re grinding; fine powder with gas outflow mill, collected in the dust collecting system, which is product. Entering the warehouse storage through the conveying and lifting machine. No metal parts by hot air flow with the coarse particles and accidentally enter the sink from the wind ring, the scraper scraping, the outer loop bucket feed mill for regrinding.
2.3 Finished product storage
At mill end provided with two mixing machine and the external active admixture device, to meet the production requirements of concrete admixture. Qualified finished hoist, chute into the 3 x 26 metres of 15 seat plate stored in the library. The bottom is provided with a charging chute, finished by the bottom unloading equipment, bulk loading machine factory.
3. Main equipment configuration of grinding system
The production line is in accordance with the annual output of 600 thousand tons of iron ore /100 million tons of cement grinding system design, configuration and main equipment performance parameters are shown in table 1:
Table 1 Main equipment configuration and performance parameters of the grinding system
Device name | Performance specifications and design specifications | Quantity(set) |
furnace in fluid bed | heat capacity:1600×104kcal/h | 1 |
Roller mill | GRM46.41 Grinding particle size:≤40mm Grinding moisture:≤15% Production capacity:slag105t/h,cement150t/h Power:3150kW | 1 |
Bag filter | Total filtration area:450000m3/h Net filtration area:7860m2 Filtration rate:0.92m/s Air volume:433000m3/h | 1 |
System fan | Air volume:450000m3/h Total pressure:8100Pa Power:1400kW | 1 |
Main economic indicators | design value | actual mean |
Output,t/h | Slag:105 Cement:150 Admixture:180 | Slag:110 Cement:180 Admixture:200 |
Specific surface area, m2/kg | Slag:≥420 Cement: ≥330 Admixture:≥300 | Slag: ≥430 Cement: ≥350 Admixture: ≥350 |
Total installed capacity of production line | High pressure:4550kW Low pressure:712kW | |
Comprehensive energy consumption of products kwh/t | Slag:40 Cement:35 Admixture:33 | Slag: 37 Cement:32 Admixture:28 |
Dust emission level mg/Nm3 | 30 | 20 |
Previous:New Year’s Address